Ck20 Honed Pipe

Ck20 Honed Pipe i ntroduction WUXI HENGTONG PETROLIC MACHINERY has two factories of 40000 square meters and totally 150 employees manufactures Ck20 Honed Pipes, ready to hone tubes, honed tubes, skived and roller burnished tubes, chrome bar, piston rods and high-precision cold-drawn steel tubes,...
Chat Now

Product Details

Ck20 Honed Pipe introduction

WUXI HENGTONG PETROLIC MACHINERY has two factories of 40000 square meters and totally 150 employees manufactures Ck20 Honed Pipes, ready to hone tubes, honed tubes, skived and roller burnished tubes, chrome bar, piston rods and high-precision cold-drawn steel tubes, We are well-equipped with 300 ton, 150 ton, 65 ton, 20 ton of cold drawing machine,9 meters CNC boring machines, 20 sets honing machines , one set furnace and advanced quality testing equipment, which combine cold drawn, cold-rolled, heat treatment and traditional machining process.

Ck20 Honed Pipes detail

Application: producing of hydraulic/ pneumatic cylinders, pumps, motor shells, transmission shafts and transmission roller steel pipes.

Original: Jiangsu, China

Certification: ISO9001.

Material: SAE1020, 20#, ST45, CK45, ST52, E355

Payment term: TT, LC

Delivery date: usually 20 to 40 days.

Packing: packed in bundle, oiled inside, with caps on both ends.

Market: Middle East/ Africa/Asia/South America/Europe/North America

MOQ:  Depends on exact size and material.

Chemical Properties:

Material

C%

Mn%

Si%

S%

P%

20#

0.17-0.23

0.35-0.65

0.17-0.37

≤0.035

≤0.035

ST45

≤0.21

≥0.4

≤0.35

≤0.025

≤0.025

E255

≤0.21

0.4-1.1

≤0.35

≤0.025

≤0.025

45#

0.42-0.50

0.50-0.80

0.17-0.37

≤0.035

≤0.035

Q345B

≤0.20

≤1.70

≤0.50

≤0.035

≤0.035

E355

≤0.22

≤1.6

≤0.55

≤0.025

≤0.025

ST52

≤0.22

≤1.6

≤0.55

≤0.04

≤0.04

25Mn

0.22-0.29

0.70-1.0

0.17-0.37

≤0.035

≤0.035

27SiMn

0.24-0.32

1.10-1.40

1.10-1.40

≤0.035

≤0.035

Stainless Steel Cylinder Tube.jpg

After-sales service: 
1. Where to buy our products for one year warranty and life long maintenance. 
2. 24-hour telephone service. 
3. A large stock of components and parts, easily-worn parts. 

Production process

Raw material – annealing for material of 45#, 27SiMn, 25Mn – Acid cleaning – parkerizing & Saponifying – cold drawn – leveling – saw off bad section – stress relieving – leveling –honing or skiving – inspection – oiled plated - packing

Quality control

1. We only buy raw material from famous tube factory, and Checking raw material quality before production.

2. We check the tube ID tolerance, OD tolerance and surface after cold drawn one by one.

3. We inspect the honed tube inside tolerance and surface again one by one after honing or skiving.

Packaging & Delivery

Packaging Details

in bundle, with plastic caps, anti-rusted oiled, with woven bags

Delivery Time

Shipped in 20 days after payment

Our team.jpg

Inquiry