St52 Steel Honed Tube introduction
WUXI HENGTONG PETROLIC MACHINERY manufactures pre honed tubes, ready to hone tubes, honed tubes, skived and roller burnished tubes, chrome bar, piston rods and high-precision cold-drawn steel tubes, We are well-equipped with 300 ton, 150 ton, 65 ton, 20 ton of cold drawing machine,9 meters CNC boring machines, 20 sets honing machines , one set furnace and advanced quality testing equipment, which combine cold drawn, cold-rolled, heat treatment and traditional machining process.
St52 Steel Honed Tubes detail
Application: producing of hydraulic/ pneumatic cylinders, pumps, motor shells, transmission shafts and transmission roller steel pipes.
Original: Jiangsu, China
Certification: ISO9001.
Material: SAE1020, 20#, ST45, CK45, ST52, E355
Payment term: TT, LC
Delivery date: usually 20 to 40 days.
Packing: packed in bundle, oiled inside, with caps on both ends.
Market: Middle East/ Africa/Asia/South America/Europe/North America
MOQ: Depends on exact size and material.
Size and Tolerance:
|
Working method |
Cylinder ID (mm) |
Length (m) |
Straightness (mm/m) |
Tolerance on ID |
Tolerance on WT |
Roughness (μm) |
|
Cold drawn |
40-320 |
≤12M |
0.2-0.5 |
/ |
±5% |
0.8-1.6 |
|
Cold rolling |
30-100 |
≥12M |
0.2-0.5 |
/ |
±5% |
0.8-1.2 |
|
cold drawn- honed |
40-500 |
8M |
0.2-0.3 |
H8-H9 |
±5% |
0.2-0.8 |
|
Cold drawn-skived |
40-400 |
7M |
0.2-0.3 |
H8-H9 |
±5% |
≤0.4 |
|
Deep hole boring- honed |
320-400 |
8M |
0.2-0.3 |
H7-H9 |
±8% |
≤0.8 |
|
Deep hole boring- skived |
320-400 |
7M |
0.2-0.3 |
H8-H9 |
±8% |
≤0.4 |
Packaging & Delivery
|
Packaging Details |
in bundle, with plastic caps, anti-rusted oiled, with woven bags |
FAQ
1. Q:Are you a manufacturer, trading company or a third party?
A:We are a manufacturer, and we have builded up our company since 2001.
2. Q:What is your minimum order quantity, can you send me samples?
A: the Exact MOQ depends on your exact requirement. And sample is available.
3. Q:What is the delivery time?
A: Usually from 20 to 40 days.
4. Q: May i know which payment will be accepted by your company?
A:So far 30% deposit paid by T/T, balance before delivery. L/C at sight also ok.
5. Q:Is your price competitive?
A: Only good quality we supply. Surely we will give you best factory price based on
superior product and service.
6. Q: How is your price level?
A: Factory direct sale, we have whole production line ourselves.
Hot Tags: st52 steel honed tube, China, manufacturers, suppliers, factory, price, Hydraulic Tilting Positioner, Q345B Honed Tube, Tube Welding Positioner, 4140 seamless cold drawn tube, Hydraulic Honing Pipe, 4130 Seamless Cold Drawn Gas Tube